Project
The 45,667 m² complex near Wunstorf air base turns former farmland into a maintenance site for the German Air Force's Airbus A400M. A main maintenance hangar is surrounded by workshops, offices and supporting buildings; the hall is flanked by workshops and offices to the west and north and is designed as a pure steel structure on a solid slab. A canteen between the office wing and the parking structure connects to its neighbours via a closed pedestrian bridge.
The façades combine traditional clinker brick on the office and ancillary buildings with a functional metal façade on the hangar. The project is pre-certified DGNB Gold; its sustainability concept was developed together with DGNB auditors, and the project was delivered in BIM through to the as-built model.
Responsibility: project architect and lead BIM coordinator for HOAI stages 3 to 7 — revising the design drawings and structural changes, construction drawings to scale, quantity take-offs and cost estimates, updating the permit drawings, bills of quantities, functional specifications and key details. Leading the BIM coordination meetings for clash-free models and automating the transfer of building services into the architectural drawings.
