Project
One part of the i2030 sub-project “removing bottlenecks and developing the S-Bahn network” is a denser timetable on the outer branches of Berlin's suburban rail network. Here, the aim of the infrastructure upgrade between Mahlsdorf and Strausberg Nord (section S5 Ost) is to deliver the higher frequency of the S5 line reliably. Trains to and from the depot and the ZBA in Fredersdorf must also be possible without disturbing regular service every 10 minutes.
Responsibility: BIM consulting for the client (DB InfraGO) during project preparation — defining BIM goals and use cases, adapting the scopes of work (including surveying) and the template EIR, BEP offer and BEP to the project, evaluating the BEP offers against the scoring matrix, monitoring how the BEP is applied, checking 139 discipline models, and coordinating between client and contractors.