Project
The 8,608 m² extension mainly houses the German Aerospace Center (DLR), with a conference and meeting area on the ground floor. The existing ZAL is an ensemble of a central building and two wings at right angles to the Steendiekkanal on the Elbe; the central building holds shared facilities such as conference rooms, an innovation marketplace and the canteen, while labs and halls sit in the wings.
The extension enlarges the left wing (component A). The hall is built in steel, the linear block in solid construction with composite slabs. The block gets a horizontally structured fibre-cement façade, the closed hall areas sandwich panels — both matching the existing building.
Responsibility: project architect and lead BIM coordinator for HOAI stages 2 to 6 — revising stage 2 with three design options, coordinating the specialist planners towards a clash-free BIM model for the building permit, adapting stage 5, quantity take-offs for the construction drawings, and the bill of quantities, functional specification and key details.
