Project
The Wittenberge substation lies on line 6100 Berlin-Spandau – Hamburg-Altona at km 126. To keep the power supply for electric train services fully secure, the substation is being rebuilt. It provides a transformer capacity of 2 × 15 MVA. The 110 kV switchgear is built conventionally with eight feeders. The 15 kV switchgear is an air-insulated, metal-enclosed, factory-built and type-tested installation with ten feeders, as set out in the overview circuit diagram.
Responsibility: BIM management from tender preparation to project close-out — updating the BIM goals and use cases, helping to draw up the bills of quantities, review the tender documents and evaluate the bids with the BIM method, continuously updating the BEP and checking the BIM-specific construction processes against the EIR, model-based design reviews (VDR), reviewing and approving the building information models, and the model-based construction and commissioning record and handover of the models to the asset owners.