EÜ Theodor-Körner-Straße

Project

The railway bridge carrying lines 2200 and 2222 in Recklinghausen has serious structural defects that rule out an economical repair. The existing structure no longer meets today's requirements for safe and reliable rail operation. To keep the line safe and usable in the long term, the bridge has to be renewed; the project is its replacement with a new structure.

Responsibility: BIM management on the client side (DB InfraGO Fahrweg) — writing the EIR and adapting the template BEP and SOM, reviewing and approving the BEP and the contractors' deliverables (conformity with EIR/BEP), providing and administering the common data environment (CDE), specifying exchange formats and data requirements, running the BIM kick-off, and acting as the client's central contact for all BIM topics.

Next project →Das Baumhaus

Projects

About / CV

Registered architect · 11 years of experience, HOAI · certified Scrum Master

Experience

  • since 2025 SOCOTEC Ingenieure AGBIM consultant/manager, project manager · Berlin
  • 2019 – 2025 Architekten Ingenieure PSPLead architect, BIM manager, VDC admin · Hamburg
  • since 2015 Independent practiceArchitect, BIM manager, project manager, designer · Berlin
  • 2013 – 2017 Fahras ArchitectsProject architect, VDC admin · Tripoli, Libya

Education

  • 2017 – 2019 M.A. ArchitectureHochschule Anhalt (DIA) · Dessau, Germany
  • 2009 – 2015 B.Eng. Architecture and Urban PlanningAl Zawiya University · Libya
Languages
Arabic, English, German
Software
Revit, Archicad, Rhino, Solibri, BIMcollab, Desite, ACC · Python, Dynamo
E-mail→

1 / 1 EÜ Theodor-Körner-Straße