Project
The railway bridge and crossing structure at Holstenstraße in Hamburg-Altona were built in the early 1960s and have played a central role in the city's S-Bahn service ever since. They consist of five consecutive bridge sections; before the closure, 268 S-Bahn trains ran in each direction on the connecting line every weekday.
Routine inspections found defects in the structures, and the track from Holstenstraße to Altona has been closed since. For safe and reliable rail service, the single-track S-Bahn bridges partly have to be rebuilt. DB InfraGO is therefore removing the structures in 2026 and putting up temporary bridges first, while the new bridge is being planned.
Responsibility: BIM management on the client side (DB InfraGO) in HOAI stages 0–4 — running the kick-off, regular coordination meetings with the client and status reports; in project preparation, helping to define the BIM goals and use cases, to write the EIR, the template BEP and the procurement concept, and to scope, tender and evaluate design services with the BIM method, reviewing and scoring the BEP, and supporting the use of the CDE; during design, continuously updating the BEP, checking the BIM-specific design processes against the EIR, model-based design reviews (VDR), and reviewing and approving the building information models.
